Sailing rigging pdf. 1 - Rigging the reefing line 8.
Sailing rigging pdf 1 - Rigging the reefing line 8. If you have a clear idea of what the vessel is supposed to do,. 5 - Sailing downwind sail rings are in bag 1 of your delivery kit. Starting at the tack of the sail, use two of the corner ties to attach the sail to the booms (Figure 36). Minimum equipment carried on board a troop day sailing boat This resource can help with the following areas: Stage 1: I can point out the bow, stern, port and starboard of a boat. 3 - Leaving the beach 10. Attach the single block with the shackle (the first part) to the boom as above. Reefing 8. 6. Completion 10. 2 - Using the rudder 8. Sailing hints 10. the sail to the eye bolt on the lower boom. Use the outhaul lines to attach the . Tie off the head and the clew of the sail with the remaining corner ties. Fully rigged, the 3-part cascade looks like the picture below. This will Identify the sail number of your Fusion by referring to the sail number plate positioned on the port (left hand) side of the forward cockpit. Stage 2, 3 and 4: I can assist with the rigging and de-rigging of a sailing vessel. If you design a hull for upwind sailing and then fit it with square sails your rig and hull do not complement each other’s strengths and the vessel will perform poorly. 4 - Sailing Close-hauled and tacking 10. Start by wrapping one tie around the boom and through the grommet in the sail. The boom should still be held up by the main halyard, or sail. Stage 5: I can rig and equip a sailing boat for safe use in a A vessel’s rigging must work together with the hull to fulfil the purpose it was designed for. 6. clew and head of the sail to the corresponding boom cap, tripling the line and securing with a couple of half hitches. WARNING: Compliant positioning of sail numbers is defined by the racing rules of sailing as enclosed: Positioning – 1. 4 - Rigging the gennaker 6. 2 - Launching 10. Finish securing the sail using a sail ring at each grommet. 2. 1 - Fitting the rudder 7. The tie should be wrapped around twice before being secured with a square knot. 2 - Reefing the mainsail 9. 5 - Rigging the gennaker sheet 7. Rudder 7. Lay the sail on a flat surface port side up. Use the S-hook to attach the tack of . Rigging the vang The blue vang has been pre-rigged and attached to the mast but it can still be tricky to rig. 1 - Introduction 10. iboerjxkzcrhgjervagbelhqesiapyixcvibqjrmvrfppkbsbi